Этот сайт использует файлы cookie и сервисы сбора технических данных посетителей (например, IP-адрес, местоположение и др.) для обеспечения работоспособности и улучшения качества обслуживания.
Оставаясь на сайте или нажав кнопку «Принять», вы соглашаетесь с использованием данных технологий и даете свое согласие на обработку файлов cookie вашего браузера. Однако вы можете запретить обработку некоторых типов файлов cookie в настройках вашего браузера.
Обработка данных пользователей осуществляется в соответствии с Политикой обработки персональных данных и Уведомлением об использовании файлов cookie.
| Scope of work |
− Supply of equipment AGFS (manufacturing and delivery to Yuzhno-Sakhalinsk) with the warranty provision. − Supply of components and consumables for the AGFS pre-assembly, accompanied by the necessary passports, operation manuals, certificates (declarations) of conformity and calculations in accordance with TR CU 032/2013. − Supply of spare parts for commissioning, operation and maintenance. − Provision of documentation in accordance with the Vendor Documents List of Requirements.
|
| Requirements to bidders |
− Experience in design of centralized gas fire extinguishing systems using CO₂ and Halon 227ea extinguishing agents. − Provision of warranty for the supplied equipment at least 12 months from the delivery date. − Availability of a quality management system certified to ISO 9001 (or an equivalent standard as GOST R ISO 9001), valid at the time of the proposal submission. − Readiness to ensure the presence of the equipment manufacturer’s representatives for the supervision during installation works at the site. − Availability of a license from the Ministry of Emergency Situations of Russia for the following type of work: “Installation, maintenance and repair of fire extinguishing systems and their components, including dispatching and commissioning works”. − Availability of documents confirming the right of specialists to engage in the design of fire safety equipment (design of automatic fire extinguishing installations) for buildings and facilities went into operation. − SRO (self-regulatory organisation) certificate for construction, reconstruction, and major repairs (in relation to highly hazardous, technically complex, and unique capital construction facilities).
|
| Expected date of the contract award | 30 January, 2027 |
| Expected contract period | 1 year |
| Additional information | |
| Final submission date | 03.11.2026 |